RCC Slab Design Calculator โ€“ One-Way & Two-Way Slab, Sariya, BBS | IS 456:2000 Free Tool
๐Ÿ—๏ธ

RCC Slab Design Calculator One-Way & Two-Way Slab โ€” Sariya Spacing + BBS | IS 456:2000

Poori detail ek jagah: Factored moment (Mu), Ast main + distribution, bar dia, spacing, cutting length, complete BBS table, shuttering area, concrete volume โ€” sab IS 456:2000 ke mutabiq. One-way ya two-way โ€” dono design karo.

โœ“ One-Way & Two-Way โœ“ Main + Distribution Steel โœ“ Spacing Calculation โœ“ Concrete Volume & Shuttering โœ“ Complete BBS Table โœ“ AI Drawing Generator โœ“ 100% Free

Slab Type Select Karo

โ„น๏ธ One-Way: ly/lx > 2 | Sirf shorter span mein main steel
๐Ÿงฎ

Slab Input Parameters

IS 456:2000 ke anusar design

Slab ki shorter direction

Residential: 2โ€“3 kN/mยฒ, Commercial: 4โ€“5 kN/mยฒ

kN/mยฒ

Floor finish + partitions (typical: 1โ€“2 kN/mยฒ)

kN/mยฒ
mm

Rule: lx/25 (simply supported). Common: 100โ€“200mm

BBS quantity aur volume ke liye (one-way slab ke liye longer side)

๐ŸŽจ

AI Se Slab Reinforcement Drawing Banao

Values enter karne ke baad drawing generate karo โ€” plan + section view sariya detail ke saath.

๐Ÿค– CivilAI โ€” Slab Design Expert

Online
๐Ÿ—๏ธ
Namaste! Main CivilAI Slab Expert hoon.

Slab se related kuch bhi poocho:

๐Ÿ“Š Slab Bar Bending Schedule (BBS) โ€” Example

3.5m ร— 4.5m Two-Way Slab, 150mm thick, M25 Fe415, 2 kN/mยฒ LL

Bar Mark Dia Nos Spacing Cut Length Total Length Weight (kg) Position
MS-X 10 mm 23 150 mm 4.95 m 113.85 m 70.2 kg Main steel lx direction (bottom)
MS-Y 10 mm 18 175 mm 3.95 m 71.10 m 43.8 kg Main steel ly direction (bottom)
DS-X 8 mm 14 300 mm 3.95 m 55.30 m 21.8 kg Distribution steel (top)
DS-Y 8 mm 18 300 mm 4.95 m 89.10 m 35.1 kg Distribution steel (top)
EB 10 mm 8 โ€” 1.17 m 9.40 m 5.8 kg Edge / corner bars
๐Ÿ—๏ธ Total Steel โ€” 3.5m ร— 4.5m Two-Way Slab 176.7 kg โ‰ˆ 11.2 kg/mยฒ
๐Ÿ“ Spacing Formula
s = (1000 ร— Abar) / Ast
Max: 3d or 300mm (main)
Max: 5d or 450mm (dist.)
๐Ÿ”ข Cutting Length
L = clear span + 2ร—Ld
Ld = 47d (Fe415, M25)
+ hooks if required
โš–๏ธ Min Distribution
Ast,dist = 0.12% ร— b ร— D
(Fe415 โ€” IS 456 Cl.26.5.2)
= 0.0012 ร— 1000 ร— D

๐Ÿ”ฌ Slab Design โ€” IS 456:2000 Theory & Formulas

STEP 1 Slab Type Decide Karo

ly / lx > 2 โ†’ One-Way Slab

ly / lx โ‰ค 2 โ†’ Two-Way Slab

lx = shorter span, ly = longer span

One-way mein load sirf lx direction mein transfer hota hai. Two-way mein dono directions mein.

STEP 2 Factored Load & Moment

Self weight = 25 ร— D (kN/mยฒ)

wu = 1.5 ร— (SW + SDL + LL)

SS: Mu = wu ร— lxยฒ / 8

Cont: Mu = wu ร— lxยฒ / 10

Cant: Mu = wu ร— lxยฒ / 2

STEP 3 Ast Main Steel

R = Mu / (b ร— dยฒ)

pt = (0.5fck/fy)[1 โˆ’ โˆš(1 โˆ’ 4.6R/fck)]

Ast = pt ร— b ร— d

Ast,min = 0.12% ร— b ร— D (Fe415)

๐Ÿ“Œ Spacing = (1000 ร— Abar) / Ast โ‰ค min(3d, 300mm)

STEP 4 Two-Way Slab Moment Coefficients

Mux = ฮฑx ร— wu ร— lxยฒ (lx direction)

Muy = ฮฑy ร— wu ร— lxยฒ (ly direction)

ฮฑx, ฮฑy = IS 456 Table 26 coefficients

(depend on ly/lx ratio & edge condition)

โœ… Two-way slab mein dono directions mein Ast alag-alag calculate hoti hai

QUANTITY Concrete Volume & Shuttering Area

Concrete Volume
V = lx ร— ly ร— D (mยณ)
+ 5โ€“10% wastage
Shuttering Area
Soffit = lx ร— ly (mยฒ)
Sides = 2ร—(lx+ly)ร—D
Curing Period
Minimum 7 days (OPC)
14 days better practice
Shuttering: 7โ€“14 days

โ“ Aksar Pooche Jaane Wale Sawaal โ€” RCC Slab

One-way slab aur two-way slab mein kya fark hai? โ–พ
Jab slab ka ly/lx ratio 2 se zyada ho to ise one-way slab kehte hain โ€” load sirf shorter span (lx) mein transfer hota hai, longer direction mein sirf distribution steel dali jaati hai. Jab ly/lx โ‰ค 2 ho to yeh two-way slab hai โ€” load dono directions mein distribute hota hai aur dono directions mein main steel dalni padti hai. Two-way slab zyada economical hota hai kyunki load dono taraf share hoti hai.
Slab mein sariya ki spacing kaise nikalte hain? โ–พ
Spacing = (1000 ร— Area of one bar) / Ast required formula se milti hai. Area of bar = ฯ€ร—dยฒ/4 mmยฒ. IS 456:2000 Cl.26.3.3 ke anusar main steel ki maximum spacing = min(3ร—effective depth, 300mm). Distribution steel ki maximum spacing = min(5ร—effective depth, 450mm). Example: 10mm bar, Ast=500mmยฒ โ†’ Spacing = (1000 ร— 78.54)/500 = 157mm, provide 150mm c/c.
Slab ki minimum thickness kya honi chahiye? โ–พ
IS 456:2000 Cl. 23.2.1 ke anusar deflection control ke liye: Simply supported one-way slab: d โ‰ฅ lx/28 (Fe415). Continuous slab: d โ‰ฅ lx/32. Cantilever: d โ‰ฅ lx/7. Overall depth D = d + cover + half bar dia. Practically residential slabs mein 120โ€“150mm common hai, terrace slabs mein 150โ€“175mm.
Two-way slab mein IS 456 Table 26 ka kya use hai? โ–พ
IS 456:2000 Table 26 mein two-way slab ke liye bending moment coefficients ฮฑx aur ฮฑy diye hain โ€” yeh ly/lx ratio aur edge condition (all edges simply supported, two adjacent edges continuous, etc.) par depend karte hain. Formula: Mux = ฮฑx ร— wu ร— lxยฒ aur Muy = ฮฑy ร— wu ร— lxยฒ. Isse dono directions mein alag-alag Ast calculate ki jaati hai.
Slab concrete mein kitna cement, sand, aggregate lagega? โ–พ
M25 concrete (1:1:2 mix) ke liye approximately: Cement = 450 kg/mยณ, Sand = 0.45 mยณ/mยณ, Aggregate = 0.90 mยณ/mยณ. Ek 150mm thick 3.5ร—4.5m slab ka volume = 3.5ร—4.5ร—0.15 = 2.36 mยณ. Cement = 2.36ร—450 = 1062 kg โ‰ˆ 21.2 bags. 10% extra add karein wastage ke liye. Market grade concrete (RMC) use karna better option hai site par quality control ke liye.